Waste Incineration Plant

Name Waste Incineration Plant
Person of ordering Hitachi Zosen Corporation
The completion October, 2008
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
  
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
  Building certification
 Proper seal correspondence
  
Explanation
 KDC carried out not only planning but detail design.
  

Design of steel frames of the furnace structures for waste incineration plant

Name Design of steel frames of the furnace structures for waste incineration plant
Person of ordering Hitachi Zosen Corporation
The completion June, 2005
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
  
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out structure design and actual engineering for steel frame supporting waste incineration plant.
 

Evaluation of Deterioration of Drainage Plant Structure

Name Evaluation of Deterioration of Drainage Plant Structure
Person of ordering Japan Port Consultants Ltd.
The completion March, 2004
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
     
ConsultingResearchDevelopment studyProduction, procurementInstallation
    
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out evaluation of deteriorating condition on the RC and steel structure based on the investigated data.
 

Structure calculation of detached houses

Name Structure calculation of detached houses
Person of ordering Daiwa House Industry
The completion April, 2004
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
    
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC prepared strucure calculation report to get approval from the authority conserned.
 

Monument of wind turbine

Name Monument of wind turbine
Person of ordering Nasu Denki-Tekko Co.,Ltd.
The completion July, 2001
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   ◯ 
ConsultingResearchDevelopment studyProduction, procurementInstallation
     ◯
MultiplicationConstruction managementOthers  
     
Explanation
 This wind turbine with the capacity of 12KW was installed as main monument of “Kirara” Expo in Yamaguchi prefecture.
The LED installed on the wind turbine emit light in the evening.
 KDC carried out its structure design, manufacture and installation based on the design by Mr. Kowalski, France.
 

Design of the Large Ferris Wheel “Red Horse Osaka Wheel”

Name Design of the Large Ferris Wheel “Red Horse Osaka Wheel”
Person of ordering HANWA Co., Ltd.
The completion June, 2016
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   ◯
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 This is the largest Ferris wheel in Japan constructed in EXPOCITY, Osaka.
 KDC carried out planning, detail and mechanical design by means of static and/or dynamic analysis.
 <the main essential points>
 Maximum height: 123.0m
 Diameter of the wheel: 114.7m
 Number of cabin: 72 
 

Underwater Vehicle

Name Underwater Vehicle
Person of ordering Hitachi Zosen Corporation
The completion August, 1996
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
 ◯ 
ConsultingResearchDevelopment studyProduction, procurementInstallation
    ◯ 
MultiplicationConstruction managementOthers  
     
Explanation
 This vehicle, which runs along the rails located under water, was developed for aquarium, etc.
 It has a speed of 15m/min. and can accomodate four persons.
 KDC carried out its design and manufacture.
 <prototype main essential points>
Capacity: 4-crew
Run speed: 15m/min.
Dimensions: (full length) 5.5m X (high) 2.0m X (width) 3.0m
 ・The pod which the passenger got on urgently surfaces in the emergency.
 

Amusement Facility; Cycle Parachute

 
Name Amusement Facility; Cycle Parachute
Person of ordering Hitachi Zosen Corporation
The completion March, 1992
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   ◯ 
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 Eight parachute type cabins, accommodating two persons each, are moved up and down by winches. The height of the tower is about 30m.
 KDC carried out the design of structure and driving system.
 <the main essential points>
Gondola lift: 30m
Gondola number: *8 2-crew
 Speed: Drop 2.0-4.0 m/sec.
 

Amusement Facility; Rocking Cycle

Name Amusement Facility; Rocking Cycle
Person of ordering Okumura Corporation
The completion March, 1997
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis

 ◯ 
ConsultingResearchDevelopment studyProduction, procurementInstallation
   
MultiplicationConstruction managementOthers  
     
Explanation
 The cabins, accommodating two persons each, move up and down rocking back and forth. The range of lift is 13m and the speed is 20m/min.
 KDC carried out proposal, design, production, installation and maintenance.
 <the main essential points>
Lift: 13m
A vehicle: *4 2-crew (two surging, rolling two)
 Speed: 20m/min
 

Ride System for Exhibition

Name Ride System for Exhibition
Person of ordering Game machine maker
The completion March, 2005
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
    
ConsultingResearchDevelopment studyProduction, procurementInstallation
    ◯ 
MultiplicationConstruction managementOthers  
     
Explanation
 KDC designed and manufactured rail structure, driving system and trains.
 The total rail length is 300m and each train consists of 4 cabins accommodating 21 persons.
 

Display Model of Linear Motor Train

①The linear Shinkansen 1/50 diorama
②Super-conducting magnet application launcher
Name Display
Person of ordering 
The completion March, 2005
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis

 
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out design and manufacture of the model as a display of superconductivity technique.
 
Back to TOP