Architectural buildings
Name | Waste Incineration Plant | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | October, 2008 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Building certification Proper seal correspondence | |||||
Explanation | KDC carried out not only planning but detail design. |
Name | Design of steel frames of the furnace structures for waste incineration plant | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | June, 2005 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC carried out structure design and actual engineering for steel frame supporting waste incineration plant. |
Name | Evaluation of Deterioration of Drainage Plant Structure | ||||
Person of ordering | Japan Port Consultants Ltd. | ||||
The completion | March, 2004 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
Explanation | KDC carried out evaluation of deteriorating condition on the RC and steel structure based on the investigated data. |
Name | Structure calculation of detached houses | ||||
Person of ordering | Daiwa House Industry | ||||
The completion | April, 2004 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | |||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC prepared strucure calculation report to get approval from the authority conserned. |
Monument of wind turbine
Name | Monument of wind turbine | ||||
Person of ordering | Nasu Denki-Tekko Co.,Ltd. | ||||
The completion | July, 2001 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | ◯ | ||||
Multiplication | Construction management | Others | |||
Explanation | This wind turbine with the capacity of 12KW was installed as main monument of “Kirara” Expo in Yamaguchi prefecture. The LED installed on the wind turbine emit light in the evening. KDC carried out its structure design, manufacture and installation based on the design by Mr. Kowalski, France. |
Design of the Large Ferris Wheel “Red Horse Osaka Wheel”
Name | Design of the Large Ferris Wheel “Red Horse Osaka Wheel” | ||||
Person of ordering | HANWA Co., Ltd. | ||||
The completion | June, 2016 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This is the largest Ferris wheel in Japan constructed in EXPOCITY, Osaka. KDC carried out planning, detail and mechanical design by means of static and/or dynamic analysis. <the main essential points> Maximum height: 123.0m Diameter of the wheel: 114.7m Number of cabin: 72 |
Underwater Vehicle
Name | Underwater Vehicle | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | August, 1996 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | ◯ | ||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
Explanation | This vehicle, which runs along the rails located under water, was developed for aquarium, etc. It has a speed of 15m/min. and can accomodate four persons. KDC carried out its design and manufacture. <prototype main essential points> Capacity: 4-crew Run speed: 15m/min. Dimensions: (full length) 5.5m X (high) 2.0m X (width) 3.0m ・The pod which the passenger got on urgently surfaces in the emergency. |
Amusement Facility; Cycle Parachute
Name | Amusement Facility; Cycle Parachute | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | March, 1992 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | Eight parachute type cabins, accommodating two persons each, are moved up and down by winches. The height of the tower is about 30m. KDC carried out the design of structure and driving system. <the main essential points> Gondola lift: 30m Gondola number: *8 2-crew Speed: Drop 2.0-4.0 m/sec. |
Amusement Facility; Rocking Cycle
Name | Amusement Facility; Rocking Cycle | ||||
Person of ordering | Okumura Corporation | ||||
The completion | March, 1997 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | ◯ | ||||
Multiplication | Construction management | Others | |||
Explanation | The cabins, accommodating two persons each, move up and down rocking back and forth. The range of lift is 13m and the speed is 20m/min. KDC carried out proposal, design, production, installation and maintenance. <the main essential points> Lift: 13m A vehicle: *4 2-crew (two surging, rolling two) Speed: 20m/min |
Ride System for Exhibition
Name | Ride System for Exhibition | ||||
Person of ordering | Game machine maker | ||||
The completion | March, 2005 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
Explanation | KDC designed and manufactured rail structure, driving system and trains. The total rail length is 300m and each train consists of 4 cabins accommodating 21 persons. |
Name | Display | ||||
Person of ordering | |||||
The completion | March, 2005 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC carried out design and manufacture of the model as a display of superconductivity technique. |