Move to the text

Ships, Work Vessels

5th Generation Semi-Submersible Drilling oil Rig

Name 5th Generation Semi-Submersible Drilling oil Rig
Person of ordering Hitachi Zosen Corporation
The completion December, 1999
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out stability analysis and outfitting detail design etc. of the harsh environment semi-submersible drilling oil rig.
 

A cicada subrig "polar pioneer"

Name  A cicada subrig "polar pioneer"
Person of ordering  Hitachi Zosen Corporation
The completion  October, 1985
The main duties Plan, plan Development design Basic design Detailed design Analysis
     
Consulting Research Development study Production, procurement Installation
         
Multiplication Construction management Others    
         
Explanation
 The bottom of the sea oil drill rig of the half diving type.
 Design gana where this rig can tolerate the severe weather of the North Sea, a walrus condition at 122m in length, 75.6m in width
 It is done.
 We were in charge of a structure design, a part of the gi meter to install.
 

Floating Exhibition Facility

Name Floating Exhibition Facility
Person of ordering Hitachi Zosen Corporation
The completion June, 2004
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
  
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC designed the mooring system of the ship type floating exhibition facility.
 

High Speed Catamaran Passenger Ship

Name High Speed Catamaran Passenger Ship
Person of ordering Domestic ship design consultant
The completion February, 2003
Main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
    
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 This is a wave piercer type high speed vessel, for which KDC carried out stability and structure design.
 

Working vessel for collecting debris on the sea surface

Name Working vessel for collecting debris on the sea surface
Person of ordering Domestic maker
The completion March, 1998
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   
ConsultingResearchDevelopment studyProduction, procurementInstallation
    
MultiplicationConstruction managementOthers  
     
Explanation
 This is a catamaran type debris collecting working vessel.
 The working vessel can be transported by a truck.
 KDC carried out design and manufacture. 
 

Reconstruction of Japanese Traditional Wooden Cargo Vessel

The state that I am constructing
Display between the space-time of the Naniwa Sea
Name Reconstruction of Japanese Traditional Wooden Cargo Vessel
Person of ordering Association of Osakako development technology
The completion July, 2000
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis

 
ConsultingResearchDevelopment studyProduction, procurementInstallation
    
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out preliminary study, design and construction management.
 The reconstructed ship was displayed in Osaka Maritime Museum. 
 

Semi-Submersible Barge

Name Semi-Submersible Barge
Person of ordering FUKADA SALVAGE & MARINE WORKS CO., LTD.
The completion June, 2017
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
*
** 
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 Length: 141.02m
 Breadth: 36.00m
 Dead weight: 24.450ton
 KDC carried out basic and detail design. 
 
Back to TOP