Plants, Equipment related to Energy
Intake Cooling System for Gas Turbine
Name | Intake Cooling System for Gas Turbine | ||||
Person of ordering | Shinsho Corporation | ||||
The completion | June, 2002 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ||||
Consulting | Research | Development study | Production, procurement | Installation | |
◯ | |||||
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | Because 10-15% of output has decreased it at the GTG co-generation in the summer, I use surplus steam of the summer The system which maintains the output by doing it, and preparing cold water, and cooling combustion air of GTG. It can make up for electricity shortage of the summer and contributes to energy saving and global warming. |
Gas Engine Cogeneration Plant
Name | Gas Engine Cogeneration Plant | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | 2006 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | |||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | KDC carried out detail design for piping by means of 3D CAD, PDMS. |
Melting Snow Facilities
Name | Melting Snow Facilities | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | November, 1996 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | |||||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
◯ | ◯ | ||||
Explanation | This system was developed for energy saving by making use of the groundwater as a source of a heat pump for melting snow facilities. KDC carried out detail design and engineering. |
The exhaust heat recovery boiler for power plant
Name | The exhaust heat recovery boiler for power plant | ||||
Person of ordering | IMEX Co.,Ltd. | ||||
The completion | June, 2004 | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | |||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
Explanation | This boiler produces steam utilizing exhaust heat of the gas turbine power generator. KDC carried out basic and detail design. |
Power Plant
Name | Power Plant | ||||
Person of ordering | Hitachi Zosen Corporation | ||||
The completion | ―― | ||||
The main duties | Plan, plan | Development design | Basic design | Detailed design | Analysis |
◯ | ◯ | ◯ | ◯ | ||
Consulting | Research | Development study | Production, procurement | Installation | |
Multiplication | Construction management | Others | |||
◯ | |||||
Explanation | KDC has carried out planning, basic design and detail design of various generator systems and cogeneration plants which are introduced to save energy at office buildings, factories, etc. |