Plants, Equipment related to Energy

Intake Cooling System for Gas Turbine


Name Intake Cooling System for Gas Turbine
Person of ordering Shinsho Corporation
The completion June, 2002
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
   
ConsultingResearchDevelopment studyProduction, procurementInstallation
    
MultiplicationConstruction managementOthers  
    
Explanation
 Because 10-15% of output has decreased it at the GTG co-generation in the summer, I use surplus steam of the summer
 The system which maintains the output by doing it, and preparing cold water, and cooling combustion air of GTG.
 It can make up for electricity shortage of the summer and contributes to energy saving and global warming.
 

Gas Engine Cogeneration Plant

Name Gas Engine Cogeneration Plant
Person of ordering Hitachi Zosen Corporation
The completion 2006
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
    
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 KDC carried out detail design for piping by means of 3D CAD, PDMS.
 

Melting Snow Facilities

Name Melting Snow Facilities
Person of ordering Hitachi Zosen Corporation
The completion November, 1996
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
    
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
   
Explanation
 This system was developed for energy saving by making use of the groundwater as a source of a heat pump for melting snow facilities.
 KDC carried out detail design and engineering. 
 

The exhaust heat recovery boiler for power plant

Name The exhaust heat recovery boiler for power plant
Person of ordering IMEX Co.,Ltd.
The completion June, 2004
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis
  
ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
     
Explanation
 This boiler produces steam utilizing exhaust heat of the gas turbine power generator.
 KDC carried out basic and detail design.
 

Power Plant

Name Power Plant
Person of ordering Hitachi Zosen Corporation
The completion ――
The main dutiesPlan, planDevelopment designBasic designDetailed designAnalysis

ConsultingResearchDevelopment studyProduction, procurementInstallation
     
MultiplicationConstruction managementOthers  
    
Explanation
 KDC has carried out planning, basic design and detail design of various generator systems and cogeneration plants which are introduced to save energy at office buildings, factories, etc. 
 